espaÑol
Palermo Sociedad Portuaria, servicios nauticos, manipulación, transporte y fletes terrestres.
 
 

Services to the Shipping Lines

Unit Rate USD

1. Dockage

1.1. Vessels on International Transit
1.1.1. Upto 24:00 hours LOA per hour or fraction $0.34
1.1.2. From 24:01 to 48:00 hours LOA per hour or fraction $0.40
1.1.3. From 48:01 to 90:00 hours LOA per hour or fraction $0.44
1.1.4. Over 90:01 hours LOA per hour or fraction $0.52
     
1.2. Vessels on Transshipment (Cabotaje) LOA per hour or fraction $1.55
 
1.3. Motor Vessels
1.3.1. Tug Boats Unit per Month or Fraction $1,000.00
1.3.2. Floating Cranes, Vessel, pontoons or barges Unit per Month or Fraction $500.00
1.3.3. Boats and Yachts Unit per Month or Fraction $100.00

2. Wharfage to the Cargo (UIP)

2.1. Load and Discharge    
2.1.1. Empty Container 20' Unit $25.00
2.1.2. Empty Container 40' Unit $25.00
     
2.2. Restows    
2.2.1. Restow Loaded Container of 20' and 40' Normal Cargo Unit $35.00
2.2.2. Restow Loaded Container of 20' and 40' Dangerous Cargo Unit $45.00
2.2.3. Restow Empty Container of 20' and 40' Unit $10.00
2.2.4. Restow General Cargo Tonnage or Cubic Meter $4.00
 
2.3. Transshipped
2.3.1. Loaded Container of 20' and 40' Normal Cargo Unit $25.00
2.3.1. Loaded Container of 20' and 40' Dangerous Cargo Unit $35.00
2.3.1. General Cargo Tonnage or Cubic Meter $3.00

3. Storage

3.1. Loaded Container on Transshipment (Free Time: 10 days)
3.1.1. 20' Container Unit per day $8.00
3.1.2. 40' Container Unit per day $12.00
3.1.3. General Cargo on closed or cover area Tonnage or Cubic Meter per day $0.80
3.1.4. General Cargo on open or ground area Tonnage or Cubic Meter per day $0.60
 
3.2. Empty Container (Free Time: 10 days)
3.2.1. 20' Container Unit per day $0.70
3.2.2. 40' Container Unit per day $0.95

Services to the Cargo

Unit Rate USD

1. UIP - Wharfage for General Cargo

1.1. Normal General Cargo Tonnage or Cubic Meter $4.50
1.2. Dangerous General Cargo Tonnage or Cubic Meter $5.80
1.3. Normal General Cargo on Cabotage Tonnage or Cubic Meter $1.50
1.4. Dangerous General Cargo on Cabotage Tonnage or Cubic Meter $1.80

2. UIP - Wharfage for Dry and Liquid Cargo

2.1. Normal Dry Bulk Cargo Per Tonnage $4.00
2.2. Dangerous Dry Bulk Cargo Per Tonnage $5.50
2.3. Normal Liquid Bulk Cargo Per Tonnage $4.00
2.4. Dangerous Liquid Bulk Cargo Per Tonnage $5.50

3. UIP - Wharfage for Vehicles and Similars

3.1. Vehicles up to 20 M3 Unit $40.00
3.2. Vehicles larger than 20 M3 and smaller than 40 M3 Unit $60.00
3.3. Vehicles larger than 40 M3 Unit $100.00

4. UIP - Wharfage for Containers

4.1. Loaded 20' Container - Normal Cargo Unit $85.00
4.2. Loaded 20' Container - Dangerous Cargo Unit $107.00
4.3. Loaded 40' Container - Normal Cargo Unit $110.00
4.4. Loaded 40' Container - Dangerous Cargo Unit $138.00
4.5. Empty Container - 20' y 40' Unit $25.00

5. Storage

Free time: 5 days - from day 16 on the cargo will be charged with a 35% over the tariff
 
5.1. General Cargo
5.1.1. Normal General Cargo on closed or cover area Tonnage or Cubic Meter/Day $0.80
5.1.2. Normal General Cargo on open or ground area Tonnage or Cubic Meter/Day $0.60
5.1.3. Dangerous General Cargo on closed or cover area (*) Tonnage or Cubic Meter/Day $1.00
5.1.4. Dangerous General Cargo on open or ground area (*) Tonnage or Cubic Meter/Day $0.80
5.1.5. Project Cargo on closed or cover area Sq. Mt. per Month $1.00
5.1.6. Project Cargo on open or ground area Sq. Mt. per Month $0.80
(*) Dangerous cargo will be charged storage from day 1
 
5.2. Containers
5.2.1. Loaded 20' Container - Normal Cargo Unit per day $8.00
5.2.2. Loaded 20' Container - Dangerous Cargo Unit per day $11.00
5.2.3. Loaded 40' Container - Normal Cargo Unit per day $13.00
5.2.4. Loaded 40' Container - Dangerous Cargo Unit per day $16.00
     
5.3. Vehicles
5.3.1. Vehicles up to 20 M3 Unit per day $2.00
5.3.2. Vehicles larger than 20 M3 and smaller than 40 M3 Unit per day $3.50
5.3.3. Vehicles larger than 40 M3 Unit per day $7.00

Services to the Stevedores

Unidad Tarifa USD

1. UIP - Wharfage to Maritime Stevedore Firms

1.1. General Cargo Tonnage or Cubic Meter $1.00
1.2. General Cargo on Cabotage Tonnage or Cubic Meter $0.40
1.3. Dry Bulk Tonnage $1.00
1.4. Liquid Bulk Tonnage $0.60
1.5. Vehicles upto 20 M3 Unit $1.00
1.6. Vehicles more than 20 M3 and less than 40 M3 Unit $2.00
1.7. Vehicles more than 40 M3 Unit $4.00
1.8. Loaded Container - 20' and 40' Unit $19.00
1.9. Empty Container - 20' and 40' Unit $3.00
1.10. Loaded Container on International Transit - 20' and 40' Unit $5.00
1.11. Empty Container on International Transit - 20' and 40' Unit $3.00

2. UIP - Wharfage to Land Stevedore Firms

2.1. General Cargo Tonnage or Cubic Meter $0.20
2.2. General Cargo on Cabotage Tonnage or Cubic Meter $0.20
2.3. Dry Bulk Tonnage $0.20
2.4. Liquid Bulk Tonnage $0.20
2.5. Vehicles Unit $0.20
2.6. Vehicles between 20 M3 and 40 M3 Unit $0.20
2.7. Loaded Container - 20' and 40' Unit $2.00
2.8. Empty Container - 20' and 40' Unit $2.00

3. UIP - Wharfage to Tuggage and Pilotage

3.1. Tug Boat Per Maneuver $30.00
3.2. Pilotage Per Maneuver $10.00

4. UIP - Wharfage to Other Stevedores

4.1. Fuel Supply Tonnage $1.00
4.2. Ship Chandler Supply Per Vessel $20.00
4.3. Vessel Repairing Service Per Operation $100.00
4.4. Sludge Removal Service Per Operation $50.00
4.5. Fumigation Service Per Month $50.00

Other Services

Unit Rate USD
1. Electrical power supply to refrigerated containers Unit per Day or Fraction $20.00
2. Electrical power supply for vessels and others Kw / Hour $0.20
3. Fresh Water Supply Ton $4.80
4. Sludge Removal m3 $15.00
5. Shore Crane Per Hour (Minimum 2 Hours) $500.00

Our Incentives

Porcentage
Discounts applied to Dockage and Wharfage to the Cargo (UIP)
regarding port calls and volumes managed yearly

1. Dockage

1.1. Shipping Lines between 50 and 90 yearly port calls 10%
1.2. Shipping Lines with more than 90 port calls yearly 15%

2. Wharfare to the Cargo (UIP)

2.1. General Cargo
2.1.1. Between 15,000 Tons and 80,000 Tons 13%
2.1.2. 80,001 Tons - 160,000 Tons 37%
2.1.3. More than 160,000 Tons 45%
 
2.2. Vehicles
2.2.1. Between 1,000 and 2,500 Units 10%
2.2. More than 2,500 Units 15%
 
2.3. Containers
2.3.1. Between 100 and 400 units 15%
2.3.2. 401 Units - 800 Units 20%
2.3.3. More than 800 units 25%
 
2.4. Dry Bulk
2.4.1. Between 20,000 Tons and 80,000 Tons 20%
2.4.2. 80,001 Tons - 140,000 Tons 30%
2.4.3. 140,001 Tons - 250,000 Tons 40%
2.4.4. More than 250,000 Tons 45%
 
2.5. Liquid Bulk
2.5.1. Beween 30,000 Tons and 40,000 Tons 15%
2.5.2. 40,001 Tons - 50,000 Tons 25%
2.5.3. 50,001 Tons - 60,000 Tons 30%
2.5.4. 60,001 Tons - 70,000 Tons 35%
2.5.5. More than 70,000 Tons 40%